Description
Alliant laid out all construction staking on the University of Minnesota’s new track. NCAA standards are extremely high, creating tight tolerances on this project. Alliant prepared two as-builts, once before paving and once after to ensure accuracy.While most projects allow 1/2” for error, NCAA’s maximum allowable error is 3/16”, making this one of Alliant’s most accurate projects. Alliant surveyors used the Trimble Robotic Total Station technology to ensure efficient and definite measurements.
The survey process took eight months in total and was completed in October 2018.
Services
- Construction Staking
- As-built Production
- Topographic Survey